Activity table - Chelsea C sub-precinct
|
Activity |
Activity status
|
|
Pre-cessation of refining operations |
Post-cessation of refining operations |
Industrial activities associated with sugar refining
|
P |
NA |
Development |
Minor additions and alterations to scheduled buildings and structures including:
a. the passage of piped or wired services or ducting through existing openings or old openings reopened
b. removal of redundant fixtures, brackets or attachments provided this does not damage the original fabric
c. new openings in corrugated iron of no more than 2m2 in area
d. new openings in brick walls of no more than 0.1m2 in area
e. lean-to or minor adjoining structures that:
i. are no higher than 30 per cent of the adjoining wall's height
ii. cover or obscure not more than 20 per cent of the total original wall surface area
iii. extend out (at right angles) by less than half their own height
f. the siting of plant and equipment immediately adjacent which is self-supporting, open in nature, and not higher than the adjacent wall
g. minor structures running aerially between buildings which are open in nature, not higher than the adjacent wall, and do not involve openings greater than specified in iii and iv
h. the attachment of security or safety equipment required for operational reasons, provided it could be removed at any future time without permanent damage to the building or structure
|
P |
NA |
Maintenance and routine repair of scheduled buildings and structures required for the continuous protective care of the fabric, detailing and structural integrity, including re-painting
|
P |
NA |
Additions and alterations to any Category B scheduled item not provided for above, including placing, fixing, painting or extending of a sign, attachment, flag, banner or lighting on or in association with any scheduled building or structure excluding small signs not visible from off the site displayed for on-site vehicle control or the health, safety, convenience or information of persons working within or visiting the site
|
RD |
NA |
Total or substantial demolition of any Category A scheduled item |
NC |
NA |
Total or substantial demolition of a Category B scheduled item |
D |
NA |
Demolition of buildings or structures not identified above provided that there is:
a. no likelihood of there being any permanent loss or damage of any protected fabric, element or component of a scheduled building or structure
b. no threat to the foundations or structural integrity of any scheduled building
To demonstrate compliance with clauses a and b a report prepared by a suitably qualified persons must be completed and available at the time of any building consent application prior to any demolition work starting |
P |
NA |
New buildings and structures specified as follows, sited in accordance with Precinct plan 1: Chelsea sub-precinct C - current use, and within the defined footprint area (where applicable):
a. cogeneration gas boiler, not exceeding 15m high or 200m2 in footprint
b. drive-through bulk loading facility, not exceeding 25m high or 240m2 in footprint
c. carbon plant (decolourisation) columns extension, not exceeding the height of the adjoining carbon plant or 50m2 in footprint
d. No. 2 (MAF) warehouse expansion, not exceeding 20m high or 2,025m2 in footprint
e. administration office building extension/s, not exceeding the height of the adjoining administration building or 200m2 in footprint
|
C |
NA |
New freestanding buildings and structures within Areas H or D, defined in
Precinct plan 1: Chelsea sub-precinct C - current use, where any part is within 5m of a scheduled item or within 10m of MHWS:
a. alterations and additions to any Category A scheduled item where not provided for as permitted activities
b. any building or structure that does not comply with the siting, height or footprint conditions set out in
Precinct plan 1: Chelsea sub-precinct C - current use
c. new buildings and structures, specified as follows and sited in accordance with
Precinct plan 1: Chelsea sub-precinct C - current use:
i. a continuous vacuum pan (VKT) structure visible outside the scheduled pan and powerhouse building
ii. a new bulk sugar silo structure and enclosure where any part is above 25m high
iii. coal boiler and associated buildings or structures
|
D |
NA |
Framework plans |
A framework plan, amendments to an approved framework plan or a replacement framework plan complying with clause 3.1 below
|
NA |
D |
Any land use, subdivision and/or development complying with an approved framework plan
|
NA |
RD |
A framework plan, amendments to an approved framework plan or a replacement framework plan, not complying with clause 3.1 below
|
NA |
NC |
Any land use, subdivision and/or development prior to the approval of a framework plan, or which does not comply with an approved framework plan
|
NA |
NC |