CMA disturbance related to scientific or engineering investigations, including taking samples |
P |
NC |
P |
D |
NC |
D |
Mineral prospecting, mineral exploration |
P |
Pr |
NC |
Pr |
Pr |
Pr |
CMCA mineral extraction |
D |
Pr |
NC |
Pr |
Pr |
Pr |
CMA disturbance that is:
- not otherwise provided for and meets the land and water use controls, or
- associated with removal of litter or marine debris, or
- associated with removal of sediment, vegetation and encrusting organisms from any existing lawful CMA structures, or
- associated with the burial of dead marine mammals, or
- associated with control or eradication of any exotic or introduced plant or animal species
|
P |
P |
P |
P |
P |
P
|
CMA disturbance that is associated with movement of up to 1000m3 of sediment per calendar year within the same coastal cell |
P |
D |
D |
D |
NC |
D |
CMA disturbance that is associated with movement of between 1000m3 and 10,000m3 of sediment per calendar year within the same coastal cell |
RD |
NC |
D |
D |
NC |
NC |
CMA disturbance that is not otherwise provided for |
D |
NC |
NC |
NC |
NC |
NC |
Livestock access in the CMA not otherwise provided for |
P |
Pr |
P |
P |
Pr |
Pr |
Livestock access in the CMA (other than for droving and horse riding) seven years after the date of plan notification for the General Coastal Marine zone and five years after plan notification for SEA-M2 and ONF-A1 and A) |
Pr |
Pr |
Pr |
Pr |
Pr |
Pr |
Pacific oyster shell removal other than as part of:
- aquaculture activities or
- dredging of Pacific oyster shell reefs
|
P |
P |
P |
P |
P |
P |
Mangrove seedling removal
- not in a marine reserve
- in SEA-M1 only in areas listed in Appendix 6.5 or Appendix 6.6
|
P |
P |
P |
P |
P |
P |
Mangrove removal (other than seedlings) from an area that was free of mangroves in 1996
- not in a marine reserve
- in SEA-M1 and 2 only in areas listed in Appendix 6.5
|
P |
P |
P |
P |
P |
P |
Mangrove removal in significant wading bird areas listed in Appendix 6.6 |
P |
P |
P |
P |
P |
P |
Mangrove removal to enable the operation, maintenance, use and functioning of existing lawful structures, infrastructure and drainage systems, or to ensure public health and safety in the use or operation of infrastructure
- maximum of 200m2 in GCM zone and SEA-M2, ONL and HNC overlay
- maximum of 30m2 in SEA-M1, ONC, ONFs and HH overlay |
P |
C |
P |
C |
C |
C |
Mangrove removal to enable the operation, maintenance, use and functioning of existing lawful structures, infrastructure and drainage systems, to ensure public health and safety in the use or operation of infrastructure
- greater than 200m2 in GCM zone and SEA-M2, ONL and HNC overlay
- greater than 30m2 in SEA-M1, ONFs and HH overlay
|
RD |
D |
D |
D |
D |
D |
Mangrove removal for maintaining or enhancing ecological areas, or maintaining or enhancing public access where consistent with protecting the values of the overlay |
NA |
D |
D |
D |
D |
D |
Mangrove removal, or other pruning, vegetation alteration or vegetation removal, not otherwise provided for |
RD |
NC |
D |
NC |
NC |
RD |
Pruning, vegetation alteration or vegetation removal for routine operation, repairs and maintenance within 3m of existing buildings and structures, excluding mangrove, seagrass or salt marsh removal |
P |
P |
P |
P |
P |
P |