Activity |
Activity Status
|
Discharge of wastewater or washwater from any of the following activities:
- concrete/asphalt laying for reworking and other road construction
- drilling – excluding bore development and testing
- mobile cleaners
- washing vehicles, plant or machinery
- cleaning, maintenance and preparation of surfaces of buildings, and associated that do not border, or span or otherwise extend over any water body
- road construction activities
- construction, installation, maintenance, alteration, removal or upgrading of any component of the stormwater or wastewater network that does not border, span or otherwise extend over any water body
- installation, repair, maintenance, alteration or removal of network utility infrastructure that does not border, span or otherwise extend over any water body
- quay cranes operated by Ports of Auckland
- dust suppression
- emergency services response training activities
|
P |
Discharge of water from:
- testing or emptying of pipelines, tanks or bunds
- swimming pools, other than saltwater pools and filter backwash water,
- bore development, testing or purging (dewatering), except for contaminated groundwater
- temporary and permanent discharge of diverted uncontaminated groundwater
- water used for freshwater fish farming ponds, tanks or other containment structures operating without chemical additives on a continuous flow-through basis
- trenches or other sites
|
P |
Swimming pool filter backwash to land in a manner that does not result in runoff into surface water |
P |
Discharges of potable water for the purpose of draining pipelines or water reservoirs for inspection, repair or maintenance excluding scouring water from any water supply reservoir and backwash water from water treatment plants
|
P |
Discharges for the purpose of dewatering trenches or other excavations |
P |
Discharge of dye or tracer material for investigative purposes |
P |
The discharge of geothermal water from any site in Parakai or Waiwera thermal aquifer management areas (as shown in Figures 1 and 2) |
P |
Any discharge from a New Zealand Defence Force weapons system to land within areas designated for defence purposes
|
P |
Discharge of dye or tracer material for investigative purposes that does not meet the permitted activity conditions |
C |
The discharge of wastes as a result of wet or dry abrasive blasting activities is that does not comply with the permitted activity conditions
|
C |
Discharge of wastewater or washwater from:
a. cleaning, maintenance and preparation of surfaces of buildings, and associated structures
b. installation, repair, maintenance and removal of network utility infrastructure
c. construction, installation, alteration, removal or upgrading of any component of the stormwater or wastewater network
that do not meet the permitted activity conditions |
C |
The discharge of geothermal water from any site at Parakai or Waiwera thermal aquifer management areas as shown in Figures 1 and 2 that does not comply with the permitted activity conditions |
C |
The discharge of geothermal water from any site at Parakai or Waiwera thermal aquifer management areas as shown in Figures 1 and 2, that does not comply with the controlled activity controls
|
RD |
Any discharge of geothermal water outside of Parakai and Waiwera thermal aquifer management areas as shown in Figures 1 and 2
|
D |
Any discharge of water or wastewater not otherwise authorised by a rule in the Unitary Plan |
D |
Discharge of contaminants associated with hydraulic fracturing onto or into land or water |