Activity |
All zones
|
High-use stream management area |
Wetland management areas |
Water take and use of surface water (including from lawfully established dams) |
Up to 20m3/day of water from a lake |
P |
P |
D |
Up to 5m3/day of freshwater from a river or spring |
P |
P |
D |
Water from a lawfully established off-stream dam |
P |
P |
D |
Up to 5m3/day of water from a lawfully established on-stream dam |
P |
P |
D |
Water take and use of freshwater from puna wai (natural springs) within Mâori Land |
P |
D |
D |
More than 20m3/day and no more than 100m3/day of water from a lake |
RD |
D |
NC |
Water take and use of surface water, including dams not otherwise listed or not meeting the permitted or restricted discretionary controls |
D |
D |
D |
Diverting surface water and associated discharge of water |
Drainage of production land |
P |
P |
NC |
Diversion in an artificial watercourse |
P |
P |
NC |
The discharge of water into water associated with drainage of production land or diversion of an artificial watercourse |
P |
P |
NC |
Diverting surface water not otherwise listed or not meeting the permitted activity controls |
D |
D |
NC |
Water take and use of groundwater |
Up to 5m3/day when averaged over any consecutive 20-day period |
P |
P |
P |
Up to 20m3/day, when averaged over any consecutive five-day period, and no more than 5000m3/year |
P |
P |
P |
Pump testing a bore for seven days at an average rate of no more than 1000m3/day |
P |
P |
P |
Dewatering or groundwater level control associated with a groundwater diversion permitted under the Unitary Plan |
P |
P |
RD |
Infiltration and leakage into stormwater and sewer pipes |
P |
P |
P |
Land drainage |
P |
P |
D |
Dewatering or groundwater level control associated with a groundwater diversion authorised as a restricted discretionary activity under the Unitary Plan |
RD |
RD |
RD |
Water take or use of geothermal water for communal benefit of Mana Whenua in accordance with s. 14(3)(c) of the RMA.
|
P |
P |
P |
Water take and use of geothermal water for bathing use |
D |
D |
D |
Water take and use of geothermal water for non-bathing use |
NC |
NC |
NC |
Water take and use of groundwater not otherwise listed or not meeting the permitted or restricted discretionary controls |
D |
D |
D |
Diversion of groundwater |
The diversion of groundwater caused by any excavation, trench, tunnel up to 1m diameter, or thrust bore |
P |
P |
RD |
The diversion of groundwater caused by any excavation, trench, tunnel up to 1m diameter, or thrust bore that does not meet the permitted activity controls or is not otherwise provided for |
RD |
RD |
RD |
Damming water |
Off-stream dams |
P |
P |
P |
On-stream dams existing at 23 October 2001 |
P |
P |
P |
Temporary dams |
P |
P |
P |
Weirs |
P |
P |
P |
Any dams otherwise listed or not meeting the permitted activity controls |
D |
D |
D |
Drilling holes and bores |
Holes for:
- geotechnical investigation
- mineral exploration
- geological investigation
- contaminated site investigation
- down-hole seismometers
|
P |
P |
RD |
Holes or bores for:
- stormwater disposal
- down-hole heat exchangers
|
P |
P |
RD |
Bores for groundwater level or quality monitoring |
P |
P |
RD |
Restoration, alteration or replacement of lawfully established bores |
P |
P |
RD |
Decommissioning (abandonment) holes or bores |
P |
P |
RD |
New bores for purposes not otherwise specified |
C |
C |
RD |
Holes or bores not meeting the permitted or controlled activity controls |
RD |
RD |
RD |
Transfers of water permits |
Transfers of surface water take permits |
P |
P |
P |
Transfers not meeting the permitted activity controls |
D |
D |
D |